Vegetation Management
The Importance of Vegetation Management
MINIMUM CLEARANCE
In response to vegetation management economic and operational concerns, a minimum clearance for trees and other vegetation has been established and must be maintained. The Utility Right-of-Way (ROW) gives the West Wetaskiwin REA the right to carry out vegetation management programs, including the removal of trees and brush. West Wetaskiwin REA is responsible for all vegetation management on all the distribution lines up to and including the transformer pole. REA members are responsible for all vegetation on their respective secondary lines after the transformer pole.
The West Wetaskiwin REA Utility Right-of-Way (ROW) clearances are as follows:
-
- Single Phase: 12 meters – 6 meters (19.7 feet) on either side of the line.
-
- Three Phase: 14 meters – 7 meters (23 feet) on either side of the line.
VEGETATION MANAGEMENT OPTIONS
West Wetaskiwin REA offers members three options for vegetation management of the distribution system within their ROW area, but strongly recommends Option 1 as the most cost efficient.
OPTION 1: CLEAR CUT
West Wetaskiwin REA will remove all the vegetation and subsequently the ROW will be controlled by spraying at no cost to the member. Please note the ROW is six meters on either side of the existing line on an established site and new construction sites.
OPTION 2: NO SPRAY
If members give permission to remove the brush, but do not want to use spray to control regrowth, the member must control all vegetation to a height of no more than two meters from the ground. If the members fail to meet this standard the REA will clear cut the area and bill the member for all costs incurred.
OPTION 3: TRIMMING
If members request trees on their site to be trimmed all costs incurred will be paid by the member.
If no option is chosen above, the member’s choice will automatically default to option 1.
Additionally, it is important to note the attaching of any objects to power poles (e.g., signs, birdhouses, etc.) is prohibited as they create safety hazards for the Powerline Technicians climbing the poles.